Status of our PUUF facility

The removal of the wall partition separating the two worship rooms has been completely removed as of October 13, The ADA bathroom is about half finished, and the space in the floor where the wall was needs to be filled in. Some patching of the drywall needs to be done and the rooms need a thorough vacuuming. An estimate of cost of repair to the blinds on the windows will be done tomorrow and the studs need to be moved out.

Saturday, October 17 a cleaning took place and Saturday, October 24 our PUUF stuff will be moved from UCC and into our new facility. If you can help with the move, call or text Don Allen, Jennifer Attebery, or Bob Gehrke.